The Department of Transportation has funded a number of transportation projects through ARRA. The map below displays location-specific transportation projects and provides details on the status of these projects as of October 30, 2009. By clicking on a project pinpoint on the map you will see project details including: project name and description, estimated cost, project status, start and end date, information on completion of project, and the contractor. View a larger map »
Statewide Projects
In addition to the location-specific projects found on the map, the Department of Transportation has funded several projects where work will occur in most communities across the state. These projects are not included on the interactive map. Listing of statewide ARRA transportation projects »
Listing of all ARRA funded transportation projects including location-specific and statewide projects
Listing of Statewide ARRA Transportation Projects
Bridge Washing C - 10
Contract Number: 2009-CM-024
Description: Powerwashing of 65 of Rhode Island's 772 bridges to remove road salts, dirt and bird droppings. Includes: Cumberland, East Providence, Lincoln, North Smithfield, Pawtucket, Portsmouth, Providence, and Tiverton. RIDOT goal of powerwashing all bridges with 10 contracts every 5 years.
Estimated Cost: $1,392,000
Status: Pending Re-Advertising
Start Date: TBD
Scheduled End Date: TBD
Percent Complete: 0%
Contractor: TBA
Bridge Washing C - 11
Contract Number: 2009-CM-025
Description: Powerwashing of 65 of Rhode Island's 772 bridges to remove road salts, dirt and bird droppings. Includes: Burrillville, Charlestown, Cranston, East Greenwich, Exeter, Hopkinton, Johnston, Narragansett, North Kingstown, Richmond, South Kingstown, Warwick, West Greenwich, West Warwick, and Westerly.
Estimated Cost: $984,000.00
Status: Substantially Complete
Start Date: 6/2009
Scheduled End Date: 11/2009
Percent Complete: 100.0%
Contractor: Deangelo Brothers
Statewide Striping - North
Contract Number: 2009-CT-026
Description: Application of striping on State roadways in Burrillville, Central Falls, Cumberland, Glocester, Lincoln, North Providence, North Smithfield, Pawtucket, Smithfield and Woonsocket.
Estimated Cost: $2,418,000
Status: Under Construction
Start Date: 4/2009
Scheduled End Date: 11/2010
Percent Complete: 32.5%
Contractor: Traffic Markings
Statewide Striping - East Bay
Contract Number: 2009-CT-027
Description: Application of striping on State roadways in Barrington, Bristol, East Providence, Little Compton, Middletown, Newport, Portsmouth, Providence, Tiverton and Warren.
Estimated Cost: $2,287,000
Status: Under Construction
Start Date: 4/2009
Scheduled End Date: 11/2010
Percent Complete: 32.5%
Contractor: Traffic Markings
Crack Sealing 2009 - South & Central
Contract Number: 2009-CR-056
Description: Cleaning and sealing cracks and open joints in the existing bituminous concrete pavement with a hot applied rubberized asphalt sealant.
Estimated Cost: $500,000
Status: Substantially Complete
Start Date: 7/2009
Scheduled End Date: 9/2009
Percent Complete: 100.0%
Contractor: Sealcoating, Inc.
Crack Sealing 2009 - North & East
Contract Number: 2009-CR-057
Description: Cleaning and sealing cracks and open joints in the existing bituminous concrete pavement with a hot applied rubberized asphalt sealant.
Estimated Cost: $500,000
Status: Substantially Complete
Start Date: 7/2009
Scheduled End Date: 9/2009
Percent Complete: 100.0%
Contractor: Annseal, Inc
Signal Optimization 2009
Contract Number: 2009-CT-043
Description: Statewide maintenance contract which involves signal repair and minor resurfacing as needed at roughly 60 different intersections.
Estimated Cost: $1,000,000
Status: Under Construction
Start Date: 9/2009
Scheduled End Date: 5/2010
Percent Complete: 22.0%
Contractor: J.H. Lynch & Sons
Stormdrain Retro Project BMP Monitoring
Contract Number: 2009-CH-034
Description: Project to review approximately 60 out of 130 storm water drainage systems, ponds, catch basins, etc. that were previously upgraded to meet Federal Best Management Practices, in accordance with State and Federal water quality regulations, for storm water runoff. Project will include inspection of drainage structures, cleaning and performance evaluation.
Estimated Cost: $1,100,000
Status: Pending Advertising
Start Date: TBD
Scheduled End Date: TBD
Percent Complete: 0%
Contractor: TBA
Traffic Monitoring Stations
Contract Number: 2009-CT-045
Description: Installation of radar-based vehicle detectors in several locations to collect data on traffic volume, speed, and vehicle classification used for annual reporting requirements and TMC traffic flow maps (37 stations plus 6 stations for vehicle classifications).
Estimated Cost: $1,053,000
Status: Under Construction
Start Date: 5/2009
Scheduled End Date: 6/2010
Percent Complete: 43.0%
Contractor: Arden Engineering
CCVE/RVD Design
Contract Number: 2009-CT-015
Description: Installation of radar-based vehicle detectors, at same location as existing traffic cameras, to collect data on traffic volume, speeds. The new detectors provide alerts to TMC operators to announce increasing traffic congestion. Technology will allow RIDOT to post travel time on electronic message signs (40 locations).
Estimated Cost: $505,000
Status: Under Construction
Start Date: 5/2009
Scheduled End Date: 6/2010
Percent Complete: 44.0%
Contractor: Arden Engineering